NLR FrameNet Network Operations Report
12/31/2008 - 01/06/2009

NLR FrameNet Network Operations Center

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)


None during this report period

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

5356 3-Elevated 1-Critical NLR Layer 2 Backbone Circuit CHIC-ATLA Emergency Maintenance Completed Circuit 01/03/2009 2:30 AM 01/03/2009 3:19 AM
5352 3-Elevated 1-Critical NLR Layer 2 Backbone Circuit LOSA-SUNN Maintenance Completed Circuit 01/05/2009 8:05 AM 01/05/2009 9:09 AM
5354 3-Elevated 1-Critical NLR Layer 2 Backbone Circuit DENV-SEAT Maintenance Completed Circuit 01/06/2009 8:07 AM 01/06/2009 8:15 AM

Scheduled Maintenances Detail

Ticket No.:5356:55
Subject:NLR Layer 2 Backbone Circuit CHIC-ATLA Emergency Maintenance Completed
Affected:NLR-STAR-CHIC-10GE-208
ORNL-ATLA-STAR-10GE-1
Start Time:Saturday, January 3, 2009, 2:30 AM (0230) UTC
End Time:Saturday, January 3, 2009, 3:19 AM (0319) UTC
Description: NLR Layer 2 Backbone Circuit CHIC-ATLA was unavailable to the community while circuit provider ORNL performed emergency fiber repair. Maintenance has been completed.

Ticket No.:5352:55
Subject:NLR Layer 2 Backbone Circuit LOSA-SUNN Maintenance Completed
Affected:NLR-LOSA-SUNN-10GE-198
Start Time:Monday, January 5, 2009, 8:05 AM (0805) UTC
End Time:Monday, January 5, 2009, 9:09 AM (0909) UTC
Description: NLR Layer 1 NOC Engineering, with the assistance of a Cal Poly technician, replaced a failing card in San Luis Obispo, CA. Maintenance has been completed.

Ticket No.:5354:55
Subject:NLR Layer 2 Backbone Circuit DENV-SEAT Maintenance Completed
Affected:NLR-DENV-SEAT-10GE-60
Start Time:Tuesday, January 6, 2009, 8:07 AM (0807) UTC
End Time:Tuesday, January 6, 2009, 8:15 AM (0815) UTC
Description: NLR Layer 1 NOC Engineering with the assistance of a Pacific Northwest GigaPoP technician performed fiber cleaning in Seattle, WA. A brief outage was observed. Maintenance has been completed.


Downtime and Availability



NLR FrameNet Core NodesDown TimeReporting Period Availability52 Week Availability
albu.layer2.nlr.net0 hr 0 min100.00000%100.00000%
bost.layer2.nlr.net0 hr 0 min100.00000%100.00000%
sunn.layer2.nlr.net0 hr 0 min100.00000%100.00000%
clev.layer2.nlr.net0 hr 0 min100.00000%100.00000%
hous.layer2.nlr.net0 hr 0 min100.00000%100.00000%
jack.layer2.nlr.net0 hr 0 min100.00000%100.00000%
atla.layer2.nlr.net0 hr 0 min100.00000%100.00000%
newy.layer2.nlr.net0 hr 0 min100.00000%100.00000%
rale.layer2.nlr.net0 hr 0 min100.00000%100.00000%
denv.layer2.nlr.net0 hr 0 min100.00000%100.00000%
pitt.layer2.nlr.net0 hr 0 min100.00000%100.00000%
seat.layer2.nlr.net0 hr 0 min100.00000%100.00000%
elpa.layer2.nlr.net0 hr 0 min100.00000%100.00000%
wash.layer2.nlr.net0 hr 0 min100.00000%100.00000%
losa.layer2.nlr.net0 hr 0 min100.00000%100.00000%
chic.layer2.nlr.net0 hr 0 min100.00000%100.00000%
tuls.layer2.nlr.net0 hr 0 min100.00000%100.00000%
kans.layer2.nlr.net0 hr 0 min100.00000%100.00000%
bato.layer2.nlr.net0 hr 0 min100.00000%100.00000%

Aggregate NLR FrameNet Core Nodes0 hr 0 min100.00000%100.00000%

NLR FrameNet Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
NLR-CHIC-CLEV-10GE-300 hr 0 min100.00000%98.94225%
NLR-DENV-SEAT-10GE-600 hr 8 min99.92063%99.51275%
NLR-CLEV-PITT-10GE-310 hr 0 min100.00000%99.15418%
NLR-DENV-KANS-10GE-500 hr 0 min100.00000%99.26828%
NLR-KANS-CHIC-10GE-510 hr 0 min100.00000%99.62969%
NLR-SUNN-SEAT-10GE-560 hr 0 min100.00000%99.85279%
NLR-LOSA-SUNN-10GE-480 hr 0 min100.00000%99.39790%
NLR-KANS-TULS-10GE-790 hr 0 min100.00000%99.83254%
NLR-TULS-HOUS-10GE-830 hr 0 min100.00000%99.83803%
NLR-BATO-HOUS-10GE-800 hr 0 min100.00000%99.99735%
NLR-ELPA-HOUS-10GE-880 hr 0 min100.00000%99.68419%
NLR-ELPA-LOSA-10GE-890 hr 0 min100.00000%99.68778%
NLR-BATO-JACK-10GE-960 hr 0 min100.00000%99.11028%
NLR-ALBU-DENV-10GE-940 hr 0 min100.00000%100.00000%
NLR-ALBU-ELPA-10GE-930 hr 0 min100.00000%100.00000%
NLR-NEWY-CLEV-10GE-1010 hr 0 min100.00000%99.31104%
NLR-NEWY-WASH-10GE-990 hr 0 min100.00000%99.91069%
NLR-BOST-CHIC-10GE-017930 hr 0 min100.00000%100.00000%
NLR-BOST-NEWY-10GE-017920 hr 0 min100.00000%100.00000%
NLR-LOSA-SUNN-10GE-1981 hr 4 min99.36508%99.97313%
NLR-ATLA-CHIC-10GE-021640 hr 0 min100.00000%99.87076%
NLR-ATLA-JACK-10GE-2180 hr 0 min100.00000%99.72676%
NLR-WASH-RALE-10GE-2270 hr 0 min100.00000%99.99622%
NLR-RALE-ATLA-10GE-2310 hr 0 min100.00000%99.99622%

Aggregate All NLR FrameNet Backbone Circuits1 hr 12 min99.97024%99.69553%





Upcoming Scheduled Maintenances

Ticket No.:5359:55
Subject:NLR Layer 2 Backbone Circuit DENV-SEAT Maintenance
Affected:NLR-DENV-SEAT-10GE-60
Start Time:Tuesday, January 13, 2009, 12:00 PM (1200) UTC
End Time:Tuesday, January 13, 2009, 2:00 PM (1400) UTC
Description: NLR Layer 1 NOC Engineering will be trouble shooting fiber between Seattle, WA and North Bend, WA. Outages are expected. However, the entire maintenance window has been reserved.